Feasibility
Pilot feasibility
A standardised module so feasibility can be quoted quickly and deployments scale by unit count rather than bespoke engineering.
1.8MW
Thermal capacity · per module
11.9GWh
Annual energy saved
476,000AZN
Annual cost savings (≈ $280,000)
150–1,800kW
Pilot deployment range
Sited at a refinery stream or an administrative complex, to validate the AI digital twin before portfolio-wide scale-up.
Payback period
Payback differs by case and is shown separately. The two studies model different capital costs against the same module.
Industrial case
4.9–7years
- COP
- 3.8
- 1.8 MW
- 18–40 °C → 60–90 °C
Urban / metro case
7–10years
- COP
- 3.0
- 1.8 MW
- 5–30 °C → 50–60 °C
Global precedents
The concept is proven abroad. The AI control layer and the Baku measurement set are what is new here.
London Bunhill 2
Underground heat recovery, 500+ homes heated
Warsaw M2
Metro heat-recovery system
The ask